Monday, March 18, 2013

Sturdy Construction

The latest structure features 12 feet of rebar inserted about 6 feet into the ground with PVC pipe on top. This is probably overkill, but the structure will have to survive depredations of the local squirrel gang.

No comments:

Post a Comment